Insourcing software projects with mature teams: effort estimation and resource provision at equilibrium
Effort estimation (EE) is crucial for planning software projects since it contributes to delivery goals. Nevertheless, even in agile methodologies, EE is a complex process due to environmental and structural factors surrounding the interaction between the leader and the development team. To simplify...
Kaydedildi:
Asıl Yazarlar: | Medina-Barrera, María Guadalupe, Cantón Croda, Rosa María, Gibaja-Romero, Damián Emilio |
---|---|
Materyal Türü: | Online |
Dil: | spa |
Baskı/Yayın Bilgisi: |
ACACIA A.C.
2022
|
Online Erişim: | https://cienciasadmvastyp.uat.edu.mx/index.php/ACACIA/article/view/312 |
Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
Estimation of maximum sustainable yield of the shark resource from Mexico
Yazar:: Rodríguez-Castro, Jorge Homero, ve diğerleri
Baskı/Yayın Bilgisi: (2020) -
International workshop on natural resources
Yazar:: Ruiz Cancino, Enrique; Universidad Autónoma de Tamaulipas, ve diğerleri
Baskı/Yayın Bilgisi: (2019) -
The conservation of maize genetic resources native in Tamaulipas
Yazar:: Garza-Castillo, Manuel R.
Baskı/Yayın Bilgisi: (2010) -
Effect of high hydrostatic pressure on post harvest behavior of 'manila' (Mangifera indica) at physiological maturity
Yazar:: Vargas-Ortiz, Manuel A., ve diğerleri
Baskı/Yayın Bilgisi: (2013) -
Effect of high hydrostatic pressure on post harvest behavior of ‘manila’ (Mangifera indica) at physiological maturity
Baskı/Yayın Bilgisi: (2017)